Prism Installs Mainline CIPP in Durham, NC

Over the past two weeks, Prism’s Mainline Lining Crew has been busy installing 15″-36″ CIPP in Durham, NC.  In addition to significant cost savings, these liners will eliminate root intrusion and prevent inflow and infiltration.

 

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *

19 − six =